ANNEXURE B/Depot (Conventional RMPU)
|
||||||
LIST OF EQUIPMENT/COMPONENT TO BE KEPT AT ANY POINT OF TIME BY THE CONTRACTOR FOR DEPOTS
|
||||||
S.N
|
Equipment / Component
|
Coach holding of the depot
|
||||
1-20
|
21-40
|
41-60
|
61 – 80
|
Above 80
|
||
Recommended quantity
|
||||||
1
|
Access door
|
1 set
|
1 set
|
1 set
|
1 set
|
2 sets
|
2
|
Accumulator
|
1 no
|
1 no
|
1 no
|
1 no
|
2 nos
|
3
|
Blower fan motor
|
1 no
|
2 nos
|
2 nos
|
2 nos
|
3 nos
|
4
|
Canvas set
|
1 set
|
1 set
|
1 set
|
2 sets
|
2 sets
|
5
|
Capillary
|
2 nos
|
3 nos
|
3 nos
|
4 nos
|
6 nos
|
6
|
Condenser fan motor
|
1 no
|
2 nos
|
2 nos
|
3 nos
|
4 nos
|
7
|
CFM blade (FRP & MS blade)
|
1 no
|
1 no
|
2 nos
|
2 nos
|
3 nos
|
8
|
Compressor (Scroll)
|
2 no
|
3 nos
|
4 nos
|
4 nos
|
6 nos
|
9
|
Contactor 32 A
|
1 no
|
1 no
|
2 nos
|
2 nos
|
2 nos
|
10
|
Contactor 16 A
|
1 no
|
1 no
|
2 nos
|
2 nos
|
2 nos
|
11
|
Control Transformer
|
1 no
|
1 no
|
1 no
|
2 no
|
3 nos
|
12
|
Cut out LP
|
4 no
|
8 no
|
12 nos
|
16 nos
|
20 nos
|
13
|
Cut out HP
|
4 no
|
8 no
|
12 nos
|
16 nos
|
20 nos
|
14
|
Filter – Return Air
|
8 nos
|
8 nos
|
16 nos
|
16 nos
|
24 nos
|
15
|
Filter – Fresh Air
|
8 nos
|
8 nos
|
16 nos
|
16 nos
|
24 nos
|
16
|
Refrigerant Gas
|
10 kg
|
10 kg
|
20 kg
|
20 kg
|
40 kg
|
17
|
Heater assembly
|
1 no
|
1 no
|
1 no
|
1 no
|
2 no
|
18
|
Harness cable/Harting
Connector
|
1
|
1
|
1
|
1
|
2
|
19
|
MCB / MPCB (Blower)
|
1
|
2
|
2
|
2
|
4
|
20
|
MCB / MPCB (CD)
|
1
|
2
|
2
|
2
|
4
|
21
|
MCB (Compressor)
|
1
|
2
|
2
|
2
|
4
|
22
|
MCB (Heater)
|
1
|
2
|
2
|
2
|
4
|
23
|
OHP
|
4 no
|
4 no
|
4 nos
|
4 nos
|
6 nos
|
24
|
OLP (Blower)
|
1
|
2
|
2
|
2
|
4
|
25
|
OLP (CD)
|
1
|
2
|
2
|
2
|
4
|
26
|
OLP (Compressor)
|
1
|
2
|
2
|
2
|
4
|
27
|
Rotary Switch 64 amps
|
2
|
2
|
2
|
3
|
4
|
28
|
Rotary Switch (ON/OFF)
|
1
|
1
|
1
|
2
|
2
|
29
|
Thermostat (Electronic with
sensor)
|
2
|
4
|
6
|
8
|
10
|
30
|
Timer
|
1
|
2
|
3
|
4
|
5
|
31
|
Vane Relay
|
2
|
4
|
6
|
8
|
10
|
ANNEXURE B Depot (Conventional RMPU)
|
||||||
LIST OF EQUIPMENT/COMPONENT TO BE KEPT AT ANY POINT OF TIME BY THE CONTRACTOR FOR DEPOTS
|
||||||
S.N
|
Equipment / Component
|
Coach holding of the depot
|
||||
1-20
|
21-40
|
41-60
|
61 – 80
|
Above 80
|
||
Recommended quantity
|
||||||
33
|
Evaporator Coil
|
1
|
1
|
1
|
1
|
2
|
34
|
Condenser Coil
|
1
|
1
|
1
|
1
|
2
|
35
|
Runner of Blower motor
|
2
|
2
|
2
|
4
|
4
|
36
|
Nitrogen Cylinder(18Kg)
|
1
|
1
|
2
|
2
|
4
|
ANNEXURE C/Workshops
|
||||
LIST OF EQUIPMENT/COMPONENT TO BE KEPT AT ANY POINT OF TIME
BY THE CONTRACTOR FOR WORKSHOPS
|
||||
S.N
|
Equipment / Component
|
Workshop
|
||
Qty for Coaches overhauled/month
|
||||
1-20
|
20-40
|
More than 40
|
||
1
|
Access door
|
4 set
|
8 set
|
12 set
|
2
|
Accumulator
|
2 no
|
4 no
|
8 no
|
3
|
Blower fan motor
|
8 no
|
12 nos
|
18 nos
|
4
|
Canvas set
|
8 set
|
16 set
|
20 set
|
5
|
Capillary
|
8 nos
|
12 nos
|
18 nos
|
6
|
Condenser fan motor
|
8 no
|
12 nos
|
18 nos
|
7
|
CFM blade (FRP & MS blade)
|
8 no
|
12 no
|
20 nos
|
8
|
Compressor (Scroll)
|
4 no
|
8 nos
|
12 nos
|
9
|
Contactor 32 A
|
8 no
|
12 no
|
20 nos
|
10
|
Contactor 16 A
|
8 no
|
12 no
|
20 nos
|
11
|
Control Transformer
|
4 no
|
6 no
|
10 no
|
12
|
Cut out LP
|
8 no
|
16 no
|
24 nos
|
13
|
Cut out HP
|
8 no
|
16 no
|
24 nos
|
14
|
Filter – Return Air
|
32 nos
|
48 nos
|
60 nos
|
15
|
Filter – Fresh Air
|
32 nos
|
48 nos
|
60 nos
|
16
|
Refrigerant Gas
|
80 kg
|
100 kg
|
120 kg
|
17
|
Heater assembly
|
8 no
|
1 no
|
1 no
|
18
|
Harness cable
|
8
|
16
|
24
|
19
|
MCB / MPCB (Blower)
|
4
|
8
|
12
|
20
|
MCB / MPCB (CD)
|
4
|
8
|
12
|
21
|
MCB (Compressor)
|
4
|
8
|
12
|
22
|
MCB (Heater)
|
8
|
16
|
20
|
23
|
OHP
|
8 no
|
12 no
|
16 nos
|
24
|
OLP (Blower)
|
4
|
8
|
16
|
25
|
OLP (CD)
|
4
|
8
|
16
|
26
|
OLP (Compressor)
|
4
|
8
|
16
|
27
|
Rotary Switch 64 amps
|
8
|
16
|
32
|
28
|
Rotary Switch (ON/OFF)
|
8
|
12
|
16
|
29
|
Thermostat – Electronic with
sensor
|
8
|
16
|
24
|
30
|
Timer
|
8
|
16
|
24
|
31
|
Vane Relay
|
8
|
16
|
24
|
33
|
Evaporator Coil
|
2
|
4
|
8
|
ANNEXURE C /Workshops
|
|||||
LIST OF EQUIPMENT/COMPONENT TO BE KEPT AT ANY POINT OF TIME
BY THE CONTRACTOR FOR WORKSHOPS
|
|||||
S.N
|
Equipment / Component
|
Workshop
|
|||
Qty for Coaches overhauled/month
|
|||||
1-20
|
20-40
|
More than 40
|
|||
34
|
Condenser Coil
|
2
|
4
|
8
|
|
35
|
Runner of Blower motor
|
20
|
40
|
50
|
|
36
|
Nitrogen Cylinder(18Kg)
|
8
|
12
|
24
|
|
ADDITIONAL ITEMS PROPOSED FOR WORKSHOPS
|
|||||
1
|
PCB for indication lamp
|
8
|
12
|
16
|
|
2
|
Bracket for condenser motor
|
2
|
6
|
8
|
|
3
|
AVM for RMPU
|
48
|
60
|
72
|
|
4
|
SS Frame and clamping
arrangement for cool air duct
|
4
|
6
|
8
|
|
5
|
SS Frame and clamping arrangement for return air duct
|
8
|
16
|
20
|
|
6
|
RMPU and coach profile rubber lining
|
200 metres
|
400 m
|
600 m
|
|
7
|
Strainer with capillary (5 way/ 8
way)
|
4 each
|
8 each
|
12 each
|
|
8
|
Rubber bushing for pipes
|
32
|
48
|
64
|
|
9
|
Catchall filter dryer
|
4
|
6
|
8
|
|
10
|
Condenser motor rubber cap
|
16
|
24
|
32
|
|
12
|
Socket with plug 37 pin
|
6
|
12
|
18
|
|
ANNEXURE- C1
|
|||||||||
LIST OF TOOLS TO BE KEPT AT ANY POINT OF TIME BY THE CONTRACTOR
|
|||||||||
S. N
|
Item
|
Coach holding of the depot*
|
|||||||
1-20
|
21-40
|
41-60
|
61– 80
|
Above
80
|
|||||
Recommended Quantity of tools
|
|||||||||
1
|
Screw Driver Set with 8 nos of blades
|
6
|
10
|
15
|
20
|
40
|
|||
2
|
Combination plier insulated with thick CA
sleeve with Joint cutter length 205 mm
|
6
|
10
|
15
|
20
|
40
|
|||
3
|
Socket spanner with sockets of various sizes
|
6
|
10
|
15
|
20
|
40
|
|||
4
|
Panel Key Square type ¼ size suitable for
opening control panel of AC coaches
|
6
|
10
|
15
|
20
|
40
|
|||
5
|
Hand lamp with rechargeable battery
and two core flexible copper wire (2m)
|
6
|
10
|
15
|
20
|
40
|
|||
6
|
Double end spanner set of 8 pieces size
6/7., 8/9, 10/11, 12/13, 14/5, 16/17,
18/19 & 20/22
|
6
|
10
|
15
|
20
|
40
|
|||
7
|
Allen Key various size set
|
3
|
5
|
6
|
10
|
20
|
|||
8
|
Heavy duty cable cutting knife adjustable in aluminium casing over all size 140 mm
|
6
|
10
|
12
|
20
|
40
|
|||
9
|
Adjustable spanner length 255 mm
|
1
|
2
|
4
|
6
|
8
|
|||
10
|
Nose plier 6”
|
6
|
10
|
12
|
20
|
40
|
|||
12
|
Hammer ½ kg
|
1
|
2
|
4
|
6
|
8
|
|||
13
|
Hacksaw frame with blade (+1 spare blade)
|
1
|
2
|
4
|
6
|
8
|
|||
14
|
Insulating tape
|
6
|
10
|
12
|
20
|
40
|
|||
15
|
Aluminium ladder, (Adjustable height and anchoring
arrangement)
|
1
|
2
|
2
|
4
|
4
|
|||
16
|
Digital Multimeter
|
1
|
2
|
3
|
3
|
4
|
|||
17
|
Digital thermometer
|
1
|
2
|
3
|
3
|
4
|
|||
18
|
Digital Anemometer
|
1
|
2
|
3
|
3
|
4
|
|||
19
|
Optical pyrometer
|
1
|
1
|
1
|
1
|
2
|
|||
20
|
Tongue Tester ( inverter compatible)
|
1
|
2
|
3
|
3
|
4
|
|||
21
|
Mini car washing plant for cleaning
condenser coil & evaporator coil.
|
1
|
2
|
2
|
3
|
3
|
|||
22
|
Compressor Air blower for cleaning filters
& panels (with 2.5 to 3.0 m3/min capacity
& weight of 2 to 3 kg)
|
1
|
2
|
2
|
3
|
3
|
|||
ANNEXURE- C1
|
||||||
LIST OF TOOLS TO BE KEPT AT ANY POINT OF TIME BY THE CONTRACTOR
|
||||||
SN
|
Item
|
Coach holding of the depot*
|
||||
1-20
|
21-40
|
41-60
|
61– 80
|
Above
80
|
||
Recommended Quantity of tools
|
||||||
23
|
Vacuum pump (two stage)
|
1
|
1
|
2
|
2
|
2
|
24
|
Pressure gauge. (-30 PSI to 250/450 PSI)
|
1
|
2
|
3
|
3
|
4
|
25
|
Water tub 2’ X 2’.
|
1
|
1
|
2
|
2
|
2
|
26
|
Stool (Insulated)
|
1
|
1
|
2
|
2
|
2
|
27
|
Gas charging hose.
|
1
|
2
|
3
|
3
|
4
|
28
|
Brazing Arrangement Kit
|
1
|
1
|
1
|
1
|
2
|
29
|
Filter opening key
|
4
|
4
|
4
|
6
|
8
|
30
|
Vacuum Cleaner with different attachment
|
1
|
1
|
1
|
1
|
2
|
31
|
Spray gun
|
2
|
2
|
2
|
2
|
2
|
32
|
Battery buzzer continuity tester
|
2
|
2
|
2
|
2
|
2
|
33
|
Portable welding machine
|
1
|
1
|
1
|
1
|
2
|
34
|
Powerful torch
|
1
|
1
|
1
|
1
|
2
|
35
|
Laptop with pendrive
|
1
|
1
|
1
|
1
|
1
|
*
|
For Workshops the recommended quantity to be based on number of coaches overhauled per month
|
All the meters should be calibrated & certified every year through approved agencies.