CHECKSHEET CUM LOG BOOK FOR PERIODIC OVERHAULING (POH) OF RMPU AND CONTROL PANEL OF AIR-CONDITIONING COACHES 
COACH NO. CODE : RLY.: Work starting date       :
PP SIDE/MAKE : Sr. No. Work completion date  :
NPP SIDE/MAKE: Sr. No. Total time taken:
DATE :
Sr. JOB DESCRIPTION SPECIFIED VALUE ACTUAL  VALUE REMARKS
PP NPP PP NPP
1 Removing of dust and dirt from control panel & condenser coil, cooling coil. Should be cleaned. Should be cleaned.      
2 Replacement of filter RETURN AIR 100% New 100% New      
FRESH AIR 100% New 100% New      
3 Replacement of condenser & blower motor. 100% POH  100% POH       
4 Replacement of condenser fan blade.  Stainless steel to new FRP  Stainless steel to new FRP     Replacement of FRP blades on conditional basis and  replace SS blades with new FRP blades.
5 Checking of Electronic thermostat   L H L H L H L H Replace Electronic thermostat by new  on conditional basis
Cooling 230 250 230 250        
Heating 190 210 190 210        
6 Normal current when package unit  is in cooling mode. 20-23 Amps 20-23 Amps      
7 Normal current when package unit  is in heating mode. 07-11 Amps 07-11 Amps      
8 Compressor-1 (CP 1) Current. 07-10 Amps 07-10 Amps      
Compressor-2 (CP 2) Current. 07-10 Amps 07-10 Amps      
9 Condenser  motor-1 (CD 1) Current. 1.5-2.1 Amps 1.5-2.1 Amps      
Condenser  motor-2 (CD 2) Current. 1.5-2.1 Amps 1.5-2.1 Amps      
10 Blower  motor Current. 1.5-2.5 Amps 1.5-2.5 Amps      
11 Over heat protection  with fixed setting  at 650C  OHP-1 & OHP-II (Fixed Setting 650C)  Trip within 5 min. (Fixed Setting 650C)  Trip within 5 min.     Replacement on conditional basis.
12 HP cut out-                                    (Range  85 to 425 PSI)           HP-I  415 PSI (Trip within 10 min. with condenser motor OFF). 415 PSI (Trip within 10 min. with condenser motor OFF).      
HP - II      
13 LP cut out-                                                   (Range  15 to 100 PSI)           LP-I  35 PSI 35 PSI      
LP - II      
14 Functional check of Timers-         (Range  00 to 180 Sec.)            TDR1 2.0 min 2.0 min     Replacement on conditional basis.
TDR2 2.5 min 2.5 min    
15 Functional check of OLR of Compressor (Range  7.5 to 11Amps)     CP 1  (10 Amp setting)  (10 Amp setting)     Replacement on conditional basis.
CP 2  (10 Amp setting)  (10 Amp setting)    
Functional check of OLR of condensor motor                                                         (Range  1.7 to 2.4 Amps)     CD 1  (2.1 Amp setting)  (2.1 Amp setting)    
CD 2  (2.1 Amp setting)  (2.1 Amp setting)    
Functional check of OLR of blower motor (Range  2.2 to 3.1 Amps)     Blower  (2.5 Amp setting)  (2.5 Amp setting)    
16 Functional check of contactor  for Compressor                                  (Range  32 Amps)     CP 1 Conditional Conditional     Replacement on conditional basis.
CP 2 Conditional Conditional    
Functional check of contactor  for condensor motor                                (Range  16 Amps)     CD 1 Conditional Conditional    
CD 2 Conditional Conditional    
 Functional check of contactor   for blower motor                                                (Range  16 Amps)     Blower Conditional Conditional    
17 Checking of  Indication PCBs. Working  Working      Replacement on conditional basis.
18 Checking of MCBs. Working  Working      Replacement on conditional basis.
19 Checking of indication lamp. (R. Y. B.) Working  Working      Replacement on conditional basis.
20 Checking of all Electric conections. Should be tight Should be                               tight      
                         
21 Functional check of Rotary switch (63 Amps. ON/OFF, 4 position)     RSW 1 Working properly  Working properly      Replace rotary switches on conditional basis 
Functional check of Rotary switch (12 Amps.2 pole , 3-way with OFF.)   RSW 2 Working properly  Working properly     
Functional check of Rotary switch(16 Amps.3 pole ,  4 position). (auto manual)   RSW 3 Working properly  Working properly     
Functional check of Rotary switch (10 Amps.2 pole , 3way without OFF.)    RSW 4 Working properly  Working properly     
22 Ensure refrigerant pipes are clamped properly. Properly clamped. Properly clamped.      
23 Ensure suction pipe for  proper lagging. Properly lagged. Properly lagged.      
24 Checking of  vane relay. By stopping the return air flow, AC plant & heater circuit should be cut OFF.     Replace vane relay  on conditional basis
25 Start the plant and check all the motors for abnormality. Working properly  Working properly       
26 Check drip tray drain. Should be Clean Should be Clean      
27 Compressor terminal, wires and Thimbal connections. Properly Tightened  Properly Tightened       
28 Antivibration mountings  for RMPU. Should be in good condition Should be in good condition     Replacement on conditional basis.
29 Heating elements (3 KW X 2). Workinng properly  Workinng properly      Replacement on conditional basis.
30 Unit and coach rubber lining. 100% New 100% New      
31 Rubber bushing/packing of pipe. 100% New 100% New      
32 Rubber gasket of Access door for fresh air filter & blower section. 100% New 100% New      
33 Condensing area covers, upper mesh guard, compressor side hinges and fastners. Properly Tightened  Properly Tightened       
34 Earthing shunt with studs. Properly Tightened  Properly Tightened      Replacement on conditional basis.
35 All wires of unit, panel and between panel & unit. Properly Tightened  Properly Tightened       
36 Checking of conduit pipes.  Properly fitted.  Properly fitted.      
37 Rubber canopy for condenser motor.                                                                                                                                                                         (Water deflector) Should be in good condition Should be in good condition     Replacement on conditional basis.
38 Check the supply of control transformer. Working properly  Working properly      Replacement on conditional basis.
39 Check the healthiness of Harness coupler. Working properly  Working properly      Replacement on conditional basis.
40 Mesh between Evaporator & heater. Should be cleaned. Should be cleaned.     Replacement on conditional basis.
41 Base insulator for heating element.  Properly fitted.  Properly fitted.     Replacement on conditional basis.
42 Knobs for Rotary switches.  Properly fitted.  Properly fitted.     Replacement on conditional basis.
43 Canvas duct for supply & return air 100%New 100%New      
44 Running Gas pressure Should be  60-65 PSI Should be 60-65 PSI CP-1 CP-2 CP-1 CP-2  
         
                         
MEGGER READING  (In Mega Ohms)
Check insulation resistance of all motors and compressors by duly calibrated 500V megger.  Insulation resistance of motors should not be less than 2 Mega Ohms. Equipement BLR CD-1 CD-2 CP-1 CP-2 CCH HTR HP-1
PP-Side                
NPP-Side                
Equipement LP-1 HP-2 LP-2 OHP-1 OHP-2 VR SENSOR
PP-Side              
NPP-Side              
Items not compliled:
Non-compliance pertmitted by:
NAME & SIGNATURE OF  NAME & SIGNATURE Of
NOMINATED RAILWAY REPRESENTATIVE  FIRM REPRESENTATIVE
FOR INSPECTION AT WORKSHOP