ANNEXURE-E
MAINTENANCE
SHCEDULE OF RMPU AND AC CONTROL PANEL (CONVENTIONAL)
S N
|
Equipm ent/ fittings
|
Activity
|
Tri p
|
Monthly
|
IOH
|
POH
|
||||||||||||||||
1
|
GENERAL
|
|
|
|
|
|
||||||||||||||||
|
|
a) Check the log sheet maintained in each AC coach and attained the
defects recorded by escorting staff during run.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Cleaning with vacuum cleaners only was not found to be effective due
to sticky dirt. The cleaning options have therefore been increased and
suitable method may be adopted as required for individual items in the panel.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
c) Check all the safety & protection devices are in working condition
and not in by passed condition
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
d) Replace defective/by passed
components including indication LEDs and lamps
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
e) Remove fresh and return air filter by opening the access doors of the
unit. Clean these filters with blowers, brushes and water tub after taking
out the filters and place them gently in their place or replace with
pre-cleaned / new filters and closed the doors properly. A cleaning jet will
be available with AMC holder/Railway for this activity.
|
√
|
√
|
To be replace d
(on conditi on basis) during IOH
|
To be replaced during POH
|
||||||||||||||||
|
|
f) Check the working of RMPU in conjuction with control panel. Status of
blower and condenser motor to be judged by running for any abnormality.
Switch ‘ON’ RSW-1 and check all three pilot lamps (Red, Yellow &
Blue) for RYB phases and power ‘ON’ indicating LED (Green) are glowing.
Put RSW-2 in
‘ON’ position and keep RSW-3 in ‘VENT’ position and check that:
Green colour indicating light for blower ‘ON’ is glowing
and Blower fan is working
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
g) Check the satisfactory operation of vane relay by stopping the return
air flow
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
h) Check the satisfactory operation of RMPU by moving RSW-3 in AUTO,
MANUAL COOLING. This can also be verified from indicating LEDs (Green
colour).
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
i) Check the cooling system is working with one condenser fan. This can be done simply by switching off
MCB 2 or MCB 3.
(During this check it should be verify that reasonable cooling is
achieved with one condenser and two
compressors working)
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
j) Check working of both RMPUs with either of the inverter on SGAC
coaches provided with two-package unit.
(The caveat on the use of single inverter has been added as a single
inverter with current setting of 32A
cannot deliver full load of 2 RMPUs about 44A)
|
-
|
√
|
√
|
√
|
||||||||||||||||
|
|
k) Check Electronic thermostat works properly i.e. AC system “Cut off”
& “Cut in” in Auto mode.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
l) Check the setting of time delay relay. As soon as power supply
switched ‘ON’, first compressor should come in circuit after 2 minutes and
second compressor after 30 second of starting of first compressor. (Ensure
provision of electronic time delay relay as per RDSO specification of
approved make)
|
-
|
√
|
√
|
√
|
||||||||||||||||
|
|
m) Check the tripping of heaters i.e. OHP1 &
OHP2. To assess the tripping of OHP1 & OHP2, put RSW-3 on ‘MANUAL
HEATING’ position with blower fan ‘OFF’. The heaters should trip within 5
minutes.
“This item has been suitably modified after issue
of Modification sheet no. RDSO/PE/MS/AC/0060 (Rev. 0) for removal of
manual heating mode. As manual heating mode is not available, an alternate method to
check OHP has been specified.
Tripping time has been retained as 5 mins. As various types of sensors
are in use- with different response time – data regarding the time taken for
tripping with 65 degree limit would
be collected before
any further change in tripping
time.”
(This activity shall be done as
winter related precaution )
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
n) Check that the compressor by pass switch RSW-5 is working satisfactorily.
It shall be done simply by moving RSW-5 at various position. The respective
LED shall glow.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
o) Check the
tripping of compressor from
high pressure and low pressure as under.
*HP 1 & HP
2: Switch ‘ON’ the comp.
with condenser fan
motor ‘OFF’ from
its MCB2 &
MCB3. Keep the unit in run condition in manual cooling mode. The comp.
should trip within 10 mins from high pressure and HP 1 trip & HP 2 trip
indicating LED will glow. High pressure (HP) cut out switch should be reset
after each tripping.
Re- setting of the
HP cutout shall
be done manually.
However, during POH,
ensure that HP setting is 400-430 psig with the help of calibratedpressure
gauge.
*LP 1 &
LP 2:Switch ‘ON’
the comp. with blower fan ‘OFF’ from its MCB. Keep the unit in run
condition in manual cooling
mode. The comp. should
trip within 10 mins
from low pressure
and LP 1 trip &
LP 2 trip
indicating LEDs will glow. Low pressure (LP) cut out switch should
automatically be reset after each tripping. Ho wever, during POH, ensure that
LP setting is 30-40 psig with the help of calibrated pressure wever, during
POH, ensure that LP setting is 30-40 psig with the help of calibrated
pressure gauge. in run condition in
manual cooling mode.
The comp. should trip within 10 minutes from low pressure and LP 1 trip & LP 2 trip indicating LEDs will glow.
Low pressure (LP) cut out switch should automatically be reset after each
tripping. However, during POH, ensure that LP setting is 30-40 psig with the
help of calibrated pressure gauge.
|
-
|
√
|
√
|
√
|
||||||||||||||||
|
|
p) Run the plants for 15 minutes (only to avoid discharge of batteries.)
and check the current drawn by various equipments with the help of clamp
tester (tonque tester) duly calibrated.
Normal currents for various equipments and mode of operation are as
under:
Package unit in cooling mode
20 – 23 Amps.
Compressor
07 – 10 Amps
Condenser fan motor
1.5 – 2.1 Amps
Blower motor
1.5 – 2.5 Amps.
Package unit in heating mode
7.0 – 11 Amps
|
-
|
√
|
√
|
√
|
||||||||||||||||
|
|
q) Check visually cond. Fan blade and ensure there is no crack on the
blade or hub. Check and verify of direction of rotation of condenser fans.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
r) Check and tighten mountings of blower, compressor and blower motors
and ensure that it is in good condition.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
s) Ensure that capillary tubes are not in hanging position.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
t) Check capillary tubes provided for HP/LP cutout for proper
support/ clamping. Their nuts should be properly tightened.
|
|
|
√
|
√
|
||||||||||||||||
|
|
u) Check for proper tightening of cover provided over evaporator compartment.
|
|
|
√
|
√
|
||||||||||||||||
|
|
v) Check that the glass cover over
indication PCB is intact.
|
|
|
√
|
√
|
||||||||||||||||
|
|
w) Check earthing shunts in control panel as well as in RMPU are
provided. The continuity check to be carried out. Earthing shunt should be
earthed to coach body.
|
|
|
√
|
To be
replaced during POH on conditio n basis.
|
||||||||||||||||
|
|
x) Check canvas duct provided at return & supply air.Rectify or
replace the same, if defective.
|
|
|
√
|
To be replaced with new during POH
|
||||||||||||||||
|
|
y) Run the plant in cooling mode and check that the condensate water from
the drip tray is
easily drained out. Clean the
drainpipe if needed.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
y1) Thorough checking of condensed/rain water tray including
leveling, periphery, outlet pocket and pipe. In case surrounding paste is dry
and brittle, re-pasting to be done
|
|
|
√
|
√
|
||||||||||||||||
|
|
z) Check solid anti-vibration mountings of compressors, condenser motors,
blower motor and over- all package unit and replace on condition basis.
|
|
|
√
|
AVM for over all package unit to be replaced on
condition basis
|
||||||||||||||||
|
|
aa) If less cooling is noticed, check the leakage of refrigerant from
the system by soap solution or
leak detector. If leak is detected, it should be attended and re- charging or
topping up of refrigerant gas in the system shall be done as per RDSO SMI No.
ELPS/AC/SMI/14.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
ab) Check insulation resistance of all the motors& compressors by
duly calibrated 500 V
megger. Attend the motors, if insulation resistance of motor is less than 2 M ohm. It may
be done from the control panel. IMPORTANT:
Disconnect LED indication, modified PCB of
thermostat &
indication light connection during this activity.
|
|
|
√
|
√
|
||||||||||||||||
|
|
ac) Check
for physically damaged/jointed
cable. Replace if needed.
|
|
|
√
|
√
|
||||||||||||||||
|
|
ad) Check for physically
damaged conduit. Replace if needed.
|
|
|
√
|
To be replaced during POH
|
||||||||||||||||
|
|
ae) Checking &
securing fixing arrangement of cover of RMPU with the roof including MS
strip, fixing screws by threaded stud etc.
|
|
√
|
√
|
√
|
||||||||||||||||
2
|
Refrigerant pipe
line/capillary checks
|
|
|
|
|
|||||||||||||||||
|
|
a) Proper clamping/ support
|
|
|
√
|
√
|
||||||||||||||||
|
|
b) Rubbing of capillary
with SS sheet/channel or other parts of RMPU (Clearance to be ensured between
capillary and SS sheet)
|
|
|
√
|
√
|
||||||||||||||||
|
|
c) Leakage from flare
nut of HP/LP cut outs with soap solution
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
d) Leakage from Feeler
tube of OHP
|
|
|
√
|
√
|
||||||||||||||||
|
|
e) Strainer/Capillary/,
Catchall filter and oil separator (if required on condition basis) to be
replaced by new one while changing compressor/ condenser/
evaporator/ attending refrigerant choke up.
(Caveat to follow the
SMI regarding replacement of compressor)
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Fire retardant Rubber packing for support
of refrigerant pipeline to be replaced in every POH
|
|
|
|
√
|
||||||||||||||||
|
|
g) Insulation over
suction pipeline wherever available to be replaced on condition
basis
|
|
|
|
√
|
||||||||||||||||
3
|
Compressors checks
|
|
|
|
|
|||||||||||||||||
|
|
a) Holding clamps from
top properly tightened.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Mounting fasteners properly tightened.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
c) Leakage from
suction & discharge port.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
d) Accumulator holding/mounting
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
e) Condensing area covers are properly
tightened & not touching top of compressor body.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Electrical terminal
box is properly tightened & cables are terminated with lugs.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
g) Defective compressor
to be replaced as per RDSO/PE/SMI/AC/0038 (REV-O)-2007. The Maneurope /
Kirloskar to be replaced only by approved model of scroll compressors as per
Rly Bd’s instruction vide letter no. 2006/Elect(G)/114/2 Pt 1 dated
14.06.2012.
|
√
|
√
|
√
|
√
|
||||||||||||||||
4
|
Condenser fans
motor/blades and Blower motor/impeller checks
|
|
|
|
|
|||||||||||||||||
|
|
a) Mounting fasteners properly tightened.
|
|
|
√
|
√
|
||||||||||||||||
|
|
b) Electrical terminal
box of motors is properly tightened & cables are terminated with lugs.
|
|
|
√
|
√
|
||||||||||||||||
|
|
c) Double earthing shunts are provided.
|
|
|
√
|
To be replaced during POH on conditio n basis.
|
||||||||||||||||
|
|
d) Water deflector* of
condenser motor (wherever provided) to be checked and replaced if found
damaged/missing. (*Water deflector is the rubber pad to prevent rain water
ingress from top)
|
|
|
√
|
√
|
||||||||||||||||
|
|
e) Blade conditions for
it’s fixing/cracking/breakage/ damage or touching with its cover.
Rectify, if needed.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Ensure
proper clamping of cable
conduit
|
|
|
√
|
√
|
||||||||||||||||
|
|
g) Replace SS blades by
FRP blades of condenser fans.
|
|
|
√
|
√
|
||||||||||||||||
|
|
h) Check normal running of the motors
|
|
|
√
|
√
|
||||||||||||||||
|
|
i) Overhauling of Blower
and condenser fan motors shall includes the following during POH:
*The incoming motors
shall be checked for
abnormal noise and vibration.
*Check bearing make and replace with specified make, if defective
*The IR value of Motor stator shall be measured between motor terminal
and frame before and
after overhauling. The Value of
IR shall not be less than 10 MΩ, when
measured with 1000 volt megger.
*Winding resistance
of motors shall be measured between
RY, YB &
BR phases. The winding
resistance shall be ±10%
of resistance declared
by OEM in cold condition.
*Check closely
terminal block and connecting lead
for any physical damage or any flash mark over it. Replace that same, if not
satisfactory.
*Perform HV
(Di-electric test) on stator by applying 1.5 kV ac supply for
one minute. During test the leakage current shall also be measured, which
shall not be less than 1.0 mA.
*Run motor
on no
load for 15 minutes and check the following:
i) Bearing noise
- Normal noise
ii) Bearing temperature rise above ambient -10°C
iii) SPM reading
-20dBN max. (Green zone)
*Measure starting current of
motors on no load. It shall not be more than 10 times of normal
runni9ng current. Similarly, the running current of motors shall be
measured and it
shall not be more than 1.4 A.
*Spray water over running motor by
jet having 10
mm dia from
all side. After spray check IR
value. There should be no fall of IR
value.
|
|
|
|
√
|
||||||||||||||||
|
|
j) Ensure that stainless steel
braided
rope is provided to avoid falling of
motor. Any kind
of sleeve
over
rope
shall not be used.
|
|
|
√
|
√
|
||||||||||||||||
|
|
k) Ensure that impellers are properly tightened.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
l) Electrical
terminal box is properly tightened
& cables are terminated with lugs
|
|
|
√
|
√
|
||||||||||||||||
5
|
Evaporator compartment
|
|
|
|
|
|||||||||||||||||
|
A) Return/ Fresh air filters
|
a) Ensure that filters
are not physical damaged.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Ensure that there is
provision to avoid wrong fitment in the filter as well as in RMPU.
|
|
|
|
√
|
||||||||||||||||
|
|
c) Ensure
that the locking arrangement for fresh/return air filters
is all right.
|
|
√
|
√
|
√
|
||||||||||||||||
|
B) HP/LP/ OHP cutout switch
|
a) Check that the
mounting fasteners are properly tightened
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Ensure proper
clamping/ support of capillary tube connected
to HP/LP/OHP cutout switch
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
c) Ensure the flare nuts
are properly tightened.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
d) Ensure Control wire
to HP/LP/OHP cutout switches are
properly clamped.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
e) Ensure
the covers of these HP/LP/OHP cutout switch are
properly screwed.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Ensure
proper clamping of feeler tube
of OHP switch.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
g) Remove the
accumulated dust over feeler
tube of OHP switch.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
h) Check the gasket
of the access doors for leakage. Replace, if required.
|
√
|
√
|
√
|
To be replaced during POH
|
||||||||||||||||
|
C) Heater
|
a) Ensure proper
mounting of heater
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Ensure
proper clamping of electrical
wire to heater.
|
|
√
|
√
|
√
|
||||||||||||||||
|
D) Thermostat/vane relay
|
a) Ensure there is no
any breakage of its mounting bracket
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Ensure Control wires
are properly clamped.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
c) Remove dust
accumulated over thermostat bulb of mercury in glass thermostat/sensor of
electronic thermostat gently.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
d) Ensure there is no
any breakage to vane
relay flapper and its micro switch is
working by stopping
the air flow through return air opening with the help of cardboard.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
e) Vane relays to be
replaced on condition basis
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Sensor for electronic
thermostat to be replaced on condition basis
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
E) Evaporator coil
|
a) Ensure there
is no damage of fins
|
|
|
√
|
√
|
||||||||||||||||
|
|
b) Ensure sharp less
bend of capillaries and properly clamped.
|
|
|
√
|
√
|
||||||||||||||||
|
|
c) Ensure there is no air
by passed
|
|
|
√
|
√
|
||||||||||||||||
|
|
d) Clean the coil,
|
|
|
√
|
√
|
||||||||||||||||
|
|
e) Check that the mounting
fasteners are properly tightened
|
|
|
√
|
√
|
||||||||||||||||
|
|
(f) ) Ensure that the filler bulb of expansion valve
is properly clamped and insulated
|
|
√
|
√
|
√
|
||||||||||||||||
|
F) Access doors
|
a) Ensure its proper
locking & gasket.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
G) Drip tray
|
a) Ensure U-trap/cups
are provided at free end of drainage pipe.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Checking and cleaning
|
|
√
|
√
|
√
|
||||||||||||||||
|
H) Cover of evaporat or compart ment
|
a) Ensure there is no
water ingress inside the evaporator compartment or air leakage from the
evaporator compartment. It shall be checked by running the plant under
artificial rain for at least
15 minutes. Water should not enter inside the
evaporator compartment.
|
|
|
|
√
|
||||||||||||||||
|
|
b) Check proper tightening of cover provided
over evaporator compartment.
|
|
√
|
√
|
√
|
||||||||||||||||
|
I) Condens er area
|
a) Clean the condenser
coil from inside with compressed air/water jet after opening the cover of
condenser area .
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
b) Ensure
there is no damage of fins
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
c) Check that the mounting fasteners are
properly tightened
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
d) Provide fire
retardant thermal insulation over suction line.
|
|
|
√
|
√
|
||||||||||||||||
|
|
e) Ensure
there is no any obstruction in fresh air path.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Ensure there is no
any damage/cracks in structure frame of RMPU.
|
|
|
√
|
√
|
||||||||||||||||
|
|
g) Ensure
proper clamping of electrical
conduit.
|
|
|
√
|
√
|
||||||||||||||||
7
|
Control panel
|
|
|
|
|
|||||||||||||||||
|
|
a) Ensure double
earthing shunts are provided on back plate.
|
|
|
√
|
To be replaced on conditio n basis during POH.
|
||||||||||||||||
|
|
b) Check that the
mounting fasteners are properly tightened
|
|
|
√
|
√
|
||||||||||||||||
|
|
c) Ensure that the
terminal block separators are not in broken condition.
|
|
|
√
|
√
|
||||||||||||||||
|
|
d) Ensure that end locks
on the DIN rail are provided.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
e) Ensure
that all legend plate as per RDSO drawing shall be
provided.
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
f) Ensure that the power
& control wires are properly tie clamped
|
|
|
√
|
√
|
||||||||||||||||
|
|
g) Ensure that the
latest wiring diagram of power &
control panel are
provided, if not provide it.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
h) Ensure that the
indication lamps for R,Y & B are mounted properly.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
i) Check mounting of
relays/contactors are properly
tightened.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
j) Check & tighten
all terminals in control panel. Cable
termination should not be
without lug of acceptable make.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
k) Ensure that the
sinusoidal 110 V, 50 Hz, ac supply for control transformer has been taken from the inverter in case
of SG AC coaches. It should not be
taken from the bus bar provided
in the control panel.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
l) Check
the proper tightening of 37 pin
connector.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
m) Ensure make, type
& range as per Bill of Material of
devices provided in control panel
|
|
|
|
√
|
||||||||||||||||
|
|
n) Check the milli volt
drop across the 3 phase of contactor. Replace the contactor, if milli volt drop is found more than the
specified limit by OEM.
|
|
|
|
√
|
||||||||||||||||
|
|
O) Ensure locking of
stopper, hinges and indication panel arrangement of control panel doors
|
√
|
√
|
√
|
√
|
||||||||||||||||
|
|
p) Ensuring accessories
like 20 mm PVC end fittings, mesh guard of RMPUs, combed hinges, nut &
bolts and knobs of rotary switches
|
√
|
√
|
√
|
√
|
||||||||||||||||
8
|
Devices in control panel
|
|
|
|
|
|||||||||||||||||
|
Rotary
/Cam
Switches
|
1. Check the
condition
of the rotary switches for
physical damage.
2. Check the
continuity
of
each phase i.e. R,Y,B. This activity shall be done by
putting the knob at OFF and ON position.
3. Do high
voltage
test by applying
1500 V for one minute between all
current carrying part shorted together and earth.
4. IR
value to be checked by 500
V megger. It
should be more than 10 MΩ.
5. Check programme sequence of switch as per OEM’s catalogue.
6. Replace thimbles/lugs,
if required.
7. Tighten terminal & mounting screws. Thread
of screw
must not be stack.
|
|
|
|
√
|
||||||||||||||||
|
MCBs
|
1. Clean the MCBs with dry compressed air
2. Check the condition of all MCBs for physical
damage.
3. Provide end locks, if it is not there.
4. Tighten DIN rail screws
5. Check the characteristic as under.
6. Check the proper function of dolly by hand
|
|
|
|
√
|
||||||||||||||||
|
Contact
ors
|
1. Clean the lower and upper part of the magnet
after opening the top cover of the contactor using cleaning agent viz CRC or equivalent.
2. Check continuity between the incoming and outgoing terminals.
3. Replace contactor if, connection pin is loosened.
4. Check continuity of
magnetic coil.
5. Clean the dust accumulated on the magnet surface gently.
6. Measure pickup and drop out voltage.
a) Pickup voltage shall not be less than 85% of rated voltage in hot condition
b) Drop out voltage shall
not be more than 20% of rated voltage in hot condition.
7. Check average
impedance & mili volt
drop as under:
|
|
|
|
√
|
||||||||||||||||
|
Over load relays
|
1. Normally closed contacts shall be checked for
continuity.
2. Check the function of NO/NC contact by putting
the relay in manual mode.
3. Check the continuity of incoming & out
going terminals after connecting it with contactor.
4. Check current setting of over load relays on
test bench and correct as under:
a)
OL-1 2.5 A
For blower motor
b)
OL-2 2.1 A
For condenser motors & OL-3
c) OL-4
& OL-5 10.0 A
For
compressors
5. Replace thimbles/lugs, if required.
6. Tighten
terminal & mounting
screws.
Note : Always keep the relays in manual mode to
avoid chattering of contactors during service.
NOTE:- Always keep the relays in manual mode to avoid chattering of contactors during service.
|
|
|
|
√
|
||||||||||||||||
|
Time delay relay
|
1. Clean the complete assembly by compressed dry air
jet.
2. Check the condition of the all both the TDRs for physical damage.
3. Replace thimbles/lugs, if equired.
4. Tighten terminal & mounting screws.
5. Check the time setting on test bench as under:
TDR1 should energize in 2.00 min and TDR2 should energize in 2 min. 30 secs.
|
|
√
|
√
|
√
|
||||||||||||||||
|
|
6. Replace TDR, if defective
|
√
|
√
|
|
√
|
|